Skip to main content

First lifting of the panels

CONIPHER demonstrator

Lifting
Text

After a first phase of installation of the CONIPHER panels on the base of the building, carried out by hand, a mini-crane equipped with a suction lifter was made available and made it possible to lift and install the first modules in height.