Skip to main content

Assembling the demonstrator panels

Industrialization

Assembly
Text

The industrial production of CONIPHER panel components completed, their assembly could begin. Thus, a total of 330 panels were produced and packaged to be shipped to the site for installation. The assembly, carried out by hand, made it possible to benefit from valuable feedback with a view to its industrialization and to appreciate the time savings obtained thanks to the design of the bindings (see video below).

play video
video